The day after Christmas and I have some FOs to show off....not that they haven't been done for a couple weeks but, you know, I don't do anything in a timely manner, apparently. But, at least I'm getting it done before the end of the year :)
| Waiting for Winter Mittens (link to Project Page) |
Pattern: Waiting for Winter Mittens and Fingerless Mitts by Susan B. Anderson
Time Frame: started November 21, 2014; finished December 3, 2014
Yarn: Cascade 220 Superwash in Celery
Needles: US #7 (4.5 mm) Signature DPNs
Size: Medium
Modification(s): None, other than sizing them to fit Sherri's hand
Thoughts: This is the fifth pair of these mittens I've made. I still like the pattern and I love how these turned out. That's about all I can say about them.
| Sorin (link to Project Page) |
Pattern: Sorin by Carrie Sullivan (irishgirlieknits)
Time Frame: started December 3, 2014; finished December 16, 2014
Yarn: Cascade 220 Superwash in Celery
Needles: US #5 (3.75 mm) Knitter's Pride 16" circular & US #7 (4.5 mm) Chai Goo 16" circular and Signature DPNs
Size: One size
Modification(s): I used US #7 instead of US #6 needles.
Thoughts: I think if I were making this for me, I'd leave out the last pattern repeat and make it a beanie. It came out as a slouch, which is fine for some people but I'm generally not one of them. I do like this pattern and I think I may just make it again :)
I hope you all had a lovely Christmas or whatever holiday/non-holiday/day you celebrated/didn't celebrate this past week :)
I have new pretties...
| Husband ordered me the KP Rosewood Interchangeables. Woo-hoo! |
| The aftermath of opening presents... |
![]() |
| Stormageddon's first Christmas |
![]() |
| Little Man loves his X-Wing Fighter backpack |
I'll be back on Sunday for my Self-Imposed Year of Projects Update #52: The Roundup :)

